1. The Physical Dimension of Panels Shall match approved
drawing.
2. All the doors & enter locks shall operate smoothly .
3. All the doors, covers shall be in perfect alignment .
4. All the components like timers are tested for accuracy.
5. Insulation resistance test is carried out using 1000V.DC
insulation tester.
6. High voltage test is carried out using 2.5KV AC H.V.
testing kit.
7. All the result are noted is the test certificate.